• Passez votre commande au 08 05 40 08 47
Livraison rapide Livraison rapide Livraison rapide

The Ashmolean Museum

Architectural plans and drawings for the building of the Ashmolean Museum were drawn up in the 1840s by the architect C.R. Cockerell (1788–1863). His contract drawings were handsome drawings in their own right, and allow one to follow the evolution of the building through successive modifications. The building was completed in 1846. The Ashmolean is currently undergoing a £49 million redevelopment. Architect Rick Mather has designed a new building to replace all but the Grade I listed Cockerell building. His design will double the existing gallery space, allow environmental control, and create a dedicated Education Centre and conservation facilities.

Collections
The world-class collection is divided into the following departments: Antiquities, Western Art, Eastern Art, Coins, Cast Gallery, Conservation.

 
BESOIN D'AIDE ? APPELEZ-NOUS AU 08 05 40 08 47 ! Ouvert du lundi au vendredi, 08h00 à 19h00
Email a Friend
Recipient Name:
Recipient Email:
Sender Name:
Sender Email:
Message:
Submit